Drilling of oil and gas wells Modern drilling rig and additional equipment with regard to the drilling program, drilling equipment selection: including BOP’s – 350-1050 atm, drilling BHA’s till 6000m, 600-1600hp mud pumps, TOP DRIVE up to 600t, circulating system up to 300m³ and other necessary equipment. |